1–2 Farm Cottages, Ashmanhaugh
Client
Private Client
Location
Ashmanhaugh, Norfolk
Duration
3 Weeks
Completion Year
2023
Project Overview
Esoteric Group was appointed to undertake the complete asbestos remediation, structural demolition, and site clearance of two fire-damaged residential cottages in Ashmanhaugh.
The scope of works required a careful, phased approach: navigating sensitive ecological constraints, safely removing licensed asbestos-containing materials (ACMs) from fire-damaged structures, grubbing out all redundant foundations, and preparing a fully levelled, crushed-concrete base for two replacement dwellings.

How We Delivered
01
The Challenge
Working on severely fire-damaged structures poses significant structural instability and hazardous material risks. Asbestos materials compromised by fire can easily release friable fibres, requiring heightened containment protocols. Additionally, the rural site location required ecological protection due to potential bat roosting sites, alongside dense tree and shrub overgrowth surrounding the perimeter that restricted initial vehicle access.
02
Our Approach
Prior to initiating physical works, Esoteric Group collaborated with a specialist ecologist to complete a comprehensive bat survey, ensuring total compliance with UK wildlife regulations. Once cleared, our teams cleared tree and shrub overgrowth to establish a stable site access route and laid a 50mm crushed concrete perimeter track. Licensed asbestos operatives then systematically removed all fire-impacted ACMs under strict containment. Following hazardous clearance, our demolition team deconstructed the cottages, meticulously segregating fire-damaged waste from recyclable structural masonry.

03
The Result
All structural elements, footings, and deep foundations were completely grubbed out and removed. Through careful source-segregation, clean masonry and hardcore were processed and re-used where possible. The site was fully levelled and finished with a clean layer of crushed concrete, leaving a safe, stable, and fully remediated ground pad ready for the construction of two new residential dwellings.
Duration
3 Weeks
Client
Private Client
Location
Ashmanhaugh, Norfolk
Completion Year
2023