What We Do
Commercial demolition demands precision, safety, and tight programme control — especially on constrained urban sites or where adjacent properties must remain operational. Esoteric Group delivers full structural dismantling with integrated asbestos removal, soft strip, and site remediation under a single contract.
Because asbestos removal is in-house, we respond immediately when hazardous materials are encountered — no programme delay waiting for a separate remediation contractor to mobilise.
We serve developers, principal contractors, and property owners across East Anglia and nationwide with complete CDM documentation and waste audit trails.
Quick Facts

What We Cover

Full Building Demolition

Partial & Selective Demolition

Soft Strip & Hazardous Removal

Site Clearance & Processing

Ground Remediation
Who We Serve

What's Included
Our Process
Survey & Planning
Pre-demolition audit including asbestos R&D survey, structural assessment, and method statement. Section 80 notice submitted where required.
Soft Strip
Non-structural elements removed first — fixtures, fittings, services, and identified hazardous materials including ACMs.
Structural Dismantling
Controlled demolition using appropriate plant — top-down dismantling, selective demolition, or mechanical collapse as the method dictates.
Processing & Clearance
Arisings sorted for recycling. Hardcore crushed on site where viable. All waste tracked with transfer notes.
Site Handover
Final level survey, contamination testing if required, and handover to client or follow-on contractor.
Why Choose Us
Integrated Asbestos Removal
Urban Site Experience
Recycling Focus
Full CDM Compliance
Common Questions
What is commercial demolition?
Commercial demolition involves the controlled dismantling, structural deconstruction, or total clearance of commercial and industrial buildings—such as offices, retail units, warehouses, and factories—to prepare the site for redevelopment or groundworks.
Do I need an asbestos survey before commencing commercial demolition?
Yes. Under the Control of Asbestos Regulations 2012, a fully intrusive Refurbishment and Demolition (R&D) Asbestos Survey is a strict legal requirement prior to any structural demolition work. Any identified Asbestos-Containing Materials (ACMs) must be safely removed before main demolition activities begin.
What planning permissions or notifications are required for commercial demolition?
Most commercial demolition projects require prior approval or full planning permission from the Local Planning Authority under the Town and Country Planning Act. Additionally, a Section 80 notice must be submitted to Local Authority Building Control under the Building Act 1984 before works commence.
How does Esoteric Group manage safety during structural demolition?
Safety is paramount on every site. We draft comprehensive Structural Method Statements (RAMS), implement site-specific exclusion zones, execute pre-demolition utility isolations, and deploy advanced dust, noise, and vibration suppression systems to protect neighbouring properties and site personnel.
What is the difference between soft strip and structural demolition?
A soft strip involves removing non-structural internal elements—such as partition walls, suspended ceilings, mechanical and electrical (M&E) services, fixtures, and floor coverings. Structural demolition involves the actual deconstruction of the building’s main frame, floors, external cladding, and load-bearing concrete or steel structures.
How much of the demolished commercial site material can be recycled?
Esoteric Group targets a 95%+ landfill diversion rate across all demolition projects. Concrete, brick, and masonry are crushed on-site for re-use as certified aggregate (such as Type 1 MOT), while metals, timber, and secondary materials are segregated and dispatches to accredited recycling facilities.
How do you handle live utilities and services on a commercial site?
Prior to initiating demolition, we coordinate with utility providers to ensure all electricity, gas, water, and telecommunications services are formally disconnected, capped, or safely diverted. We issue a formal Certificate of Isolation before structural work begins.
Can commercial demolition be carried out in live or high-density urban environments?
Yes. We specialise in complex urban demolition where space is constrained and neighboring buildings are occupied. We utilise specialised low-vibrational dismantling machinery, acoustic hoarding, real-time environmental monitoring, and tailored traffic management plans to minimise local disruption.
What handover documentation is provided after commercial demolition is complete?
Upon site completion, Esoteric Group delivers a complete Site Clearance and Handover Package. This includes final structural sign-offs, crushed material test certificates, waste transfer/consignment documentation, and verified environmental recycling metrics for your project records.