Project Overview
Esoteric Group was appointed to execute the comprehensive internal strip-out and asbestos remediation of the former Orpington Super Bowl, located on the fifth floor of a busy, operational shopping centre. The objective was to deconstruct and clear the entire leisure unit—including complex bowling alley machinery, commercial kitchens, bar facilities, and restaurant infrastructure—back to the original structural shell, leaving the extensive floor space completely clear, safe, and prepared for future commercial redevelopment.

How We Delivered

01
The Challenge
Operating on the fifth floor of an active shopping centre presented severe logistical constraints. With no direct hoist or goods lift access suitable for heavy mechanical components, traditional machinery could not be deployed. Furthermore, the presence of legacy asbestos-containing materials (ACMs) within the unit required strict containment protocols to prevent any risk of cross-contamination to the public areas and retail units operating below.
02
Our Approach
To navigate the access constraints safely, Esoteric Group executed the entire strip-out manually by hand. Our teams systematically dismantled the bowling lanes, heavy machinery, bar areas, and commercial kitchen fittings into manageable components. Materials were safely transported down five flights of stairs following strict manual handling and noise-minimisation protocols. Prior to general clearance, our licensed asbestos operatives isolated and removed all identified ACMs under controlled, negative-pressure conditions with localised dust suppression.
03
The Result
The project was completed safely, on schedule, and with zero disruption to the shopping centre’s daily retail operations. Through source-segregation on site, we successfully diverted high percentages of timber, metal, and leisure equipment away from landfill into accredited recycling streams. The 5th-floor unit was handed back as a clean, fully remediated structural shell, accompanied by complete clearance documentation.
Duration
8 Weeks
Client
Shopping Centre Management
Location
Orpington, Kent
Completion Year
2025

Project Gallery

Discuss a Project Like This

Our specialist team can assess your site and provide a competitive quotation. Free initial site assessments available across East Anglia.
Get a Quote
Free site assessment available